eLearning Development Deliverables: What Should Be Included in Your Project?

If you are commissioning a custom course this quarter, understanding eLearning development deliverables is the single best way to protect your budget and your sanity. Too many Australian L&D teams sign a statement of work, pay a deposit, and then discover six months later that they own a published SCORM file and nothing else. No source files. No storyboard. No test report. When the vendor relationship ends, so does your ability to update the course.

This guide walks through what should actually land in your inbox at each project stage, which items belong in the contract, and how to spot the gaps before they become expensive. The advice comes from the trenches of real public sector and corporate projects, not a template.

Five stages of eLearning development deliverables - Poncho eLearning

Why eLearning development deliverables matter more than the final course

Here is the uncomfortable truth. The published course is the easy part. What determines whether you can maintain, update, re-skin or migrate that course over the next five years is the package of eLearning development deliverables that sits around it. Storyboards, source files, voiceover stems, design systems, QA reports. Without them, you are locked in.

We had a state government client inherit a compliance library from a previous vendor last year. Fourteen modules. Zero source files. When legislation changed, they had to rebuild from scratch at roughly three times the original cost. That is the true price of weak deliverables.

According to the LinkedIn Learning Workplace Learning Report, L&D teams are being asked to do more with tighter budgets. Owning your deliverables is one of the few ways to keep that promise.

Stage one: discovery and scoping deliverables

Before anyone opens Storyline or Rise, your vendor should produce a short discovery pack. This is where expectations get locked in. Skip this stage and you will pay for it during stakeholder review.

At minimum, expect to receive:

  • A learner analysis summary (roles, context, device, accessibility needs)
  • Documented learning objectives mapped to business outcomes
  • A high-level content outline or module map
  • Technical specification (LMS, SCORM 1.2 or 2004, xAPI, bandwidth)
  • Project schedule with review gates and sign-off milestones

If you are new to commissioning custom work, the piece on instructional design versus eLearning development is worth a read before you sign anything. The two are different crafts, and both show up in your deliverables list.

Stage two: design and storyboard deliverables

This is where the course takes shape on paper. Any studio skipping storyboards to “save time” is actually transferring risk to you. Changes at this stage cost minutes. Changes after build cost days.

Visual design deliverables

Expect a style guide or mini design system covering colour, typography, button states, iconography and screen templates. For branded work, your vendor should produce two or three sample screens for approval before full production begins. That approval protects both sides.

Storyboard deliverables

A proper storyboard is the blueprint for every screen. It should include on-screen text, voiceover scripts, interaction descriptions, media notes and navigation logic. Formats vary (Word, Google Docs, Twine for branching), but the content shouldn’t. If your storyboard is three bullet points per screen, push back. For a deeper look at how storyboards fit the production pipeline, see our breakdown of the eLearning design and development process.eLearning development deliverables and project checklist - Poncho eLearning

Stage three: production and build deliverables

Once storyboards are signed off, production kicks in. The deliverables here are where many vendors get fuzzy. Pin them down in writing.

  • Alpha build: First functional version for review. Expect typos. Focus on structure and interactions.
  • Beta build: Media integrated, voiceover final, visuals polished. Review for accuracy and polish.
  • Gold master: Final approved version, ready to publish.
  • Voiceover files: Both the final mixed audio and the raw stems, in case you need to re-edit later.
  • Media assets: Any custom illustration, animation, video or photography produced for the course.

However you label the stages, make sure each one has a clear review window and a clear sign-off. Scope creep almost always starts when a client reopens decisions already approved at a previous gate.

Stage four: technical and compliance deliverables

This is the stage where corners get cut most often, and where you need to be most alert. A finished course that fails on your LMS or fails WCAG is not finished.

SCORM and LMS packaging deliverables

Your vendor should supply a SCORM package (or xAPI, cmi5, or AICC as agreed) tested on your actual LMS, not just SCORM Cloud. The deliverable isn’t the ZIP file alone. It is the ZIP file plus a short test report confirming completion, bookmarking, scoring and reporting all behave correctly. For projects with multiple modules, this matters even more. See our playbook on consolidating induction courses for how packaging decisions ripple through a learning pathway.

Accessibility testing deliverables

For any Australian public sector project, WCAG 2.1 AA conformance is non-negotiable. Ask for a written accessibility statement listing what was tested (keyboard navigation, screen reader compatibility, colour contrast, captions, transcripts) and any known limitations. “She’ll be right” is not an accessibility report.

Quality assurance deliverables

A QA report should show what was tested, by whom, across which browsers and devices, and what was fixed. If your vendor can’t produce one, assume testing didn’t happen.

Stage five: handover and source file deliverables

This is the stage that separates professional studios from the rest. Final handover should include everything you need to maintain, edit or migrate the course without the original vendor.

Your handover pack should contain:

  • Editable source files (Storyline .story, Rise export, Captivate .cptx, After Effects projects)
  • Final SCORM/xAPI packages
  • All approved storyboards and scripts
  • Voiceover stems and music licences
  • Image, video and font licences (or confirmation of royalty-free status)
  • Style guide and design assets
  • Technical documentation (variables, triggers, branching logic for complex courses)
  • QA and accessibility reports
  • A short “how to update” guide for your internal team

Moreover, the contract should state clearly that IP and source files transfer to you on final payment. If a vendor wants to retain source files, that is a red flag. Our guide to outsourcing eLearning development in Australia covers the contractual language worth insisting on.

Common omissions in eLearning development deliverables

After reviewing dozens of handover packs from other studios over the years, the same gaps keep appearing. Watch for these:

  • No voiceover stems, only mixed audio (makes future edits painful)
  • No font licences (your legal team will care about this eventually)
  • No design source files for custom illustrations (only flattened PNGs)
  • SCORM package tested in SCORM Cloud but never on your actual LMS
  • No accessibility statement, or a generic template with no real testing
  • Storyboards delivered as read-only PDFs instead of editable documents
  • No documentation of custom JavaScript or Storyline variables

Consequently, the quickest way to protect yourself is to list every one of these in the statement of work before signing. If a vendor pushes back, you have your answer about the relationship.

How to review and approve deliverables before final payment

Build a simple sign-off matrix at the start of the project. One column per deliverable, one row per reviewer, one date column for approval. Nothing fancy. A shared spreadsheet works.

Then withhold a meaningful final payment (15 to 25 percent is typical) until every item on the handover list is in your hands and tested. In practice, this is the single most effective governance tool you have. Vendors move quickly when the last invoice is on the line.

By contrast, paying 100 percent on course go-live and chasing source files afterwards almost never works. If you are weighing up vendors right now, the directory of best eLearning development companies in Australia is a useful starting point for shortlisting.

Lock down your eLearning development deliverables before you sign

Great courses are built on clear expectations. If you take one thing from this guide, make it this: write your eLearning development deliverables list into the contract, name every file type and format, and tie final payment to the complete handover pack. Research from Brandon Hall Group consistently shows that organisations treating L&D as a managed asset outperform those treating it as a one-off purchase. Deliverables are what make that possible.

If you are scoping a project now and want a second pair of eyes on your deliverables checklist, the team at Poncho eLearning is happy to walk through it with you. Bring your draft SOW. We’ll help you spot the gaps before they cost you.

Frequently Asked Questions About eLearning development deliverables

What are the standard eLearning development deliverables for a custom course?

Standard eLearning development deliverables include a discovery document, learning objectives, storyboards, visual design samples, alpha and beta builds, final SCORM package, source files, voiceover stems, accessibility statement, QA report and handover documentation.

Should source files be included in eLearning development deliverables?

Yes. Editable source files (Storyline, Rise, Captivate, After Effects, Illustrator) should transfer to the client on final payment. Without them, you cannot update the course without returning to the original vendor.

What accessibility deliverables should an Australian eLearning project include?

At minimum, a written accessibility statement confirming WCAG 2.1 AA testing, keyboard navigation, screen reader compatibility, captions, transcripts and colour contrast checks. Public sector projects often require this in writing before go-live.

How many review rounds should be included in the project agreement?

Typically two rounds of review per stage (storyboard, alpha, beta) with a defined scope for changes. Additional rounds should be scoped as variations. Clear review limits protect both the client and the studio from scope creep.

What is the difference between a SCORM file and a full handover pack?

A SCORM file is the published course for your LMS. A handover pack includes the SCORM file plus source files, storyboards, media licences, QA reports and documentation. Only the full pack gives you long-term ownership.

How much of the final payment should be withheld until deliverables are received?

Industry practice is to withhold 15 to 25 percent of the project fee until all deliverables, including source files and documentation, are received and verified. This is the strongest lever you have during handover.